Water Tank Construction Project the Final Phase Photo Gallery
.jpg?ixlib=rb-1.1.0&w=2000&h=2000&fit=max&or=90&s=500b14a33087999d9c3087966874b615)
Water district owned pole being installed by BRCO Constructors Nov. 27, 2018
New meter box with the new address assigned to the tank site by Sierra County. Nov 28, 2018
The newest member of Alleghany's fire hydrant family, located at the tank site. Dec. 5, 2018
PG&E owned power poles (2) in place Dec. 10, 2018
Bollards installed to protect hydrant and power pole. Dec. 14, 2018
Fence posts installed ready for fencing. Dec. 18, 2018